Plasma Bank

AL-RWAD Project

Plasma Bank

The Plasma Bank project in Mansoura records full electrical works, with the Egyptian Ministry of Health as owner and an August 2024 start.

Project Information

The Plasma Bank project in Mansoura records full electrical works, with the Egyptian Ministry of Health as owner and an August 2024 start.

Location
Mansoura
Owner
Egyptian Ministry of Health
Main Contractor
Protection
Scope
Full electrical scope
Duration
Aug 2024 - status requires update

Delivery Approach

Coordinating the Scope and Tracking Critical Details

The project approach begins with document and responsibility review, followed by route and interface coordination, delivery monitoring and inspection. Unverified challenges or results are not added to the case study.
  • Scope and drawing review
  • Discipline and interface coordination
  • Execution and quality follow-up
  • Inspection and handover support
Coordinating the Scope and Tracking Critical Details

Next Step

Planning a Project with a Similar Scope?

Send the drawings or bill of quantities to discuss the requirements and current stage.