AL-RWAD Project
Plasma Bank
The Plasma Bank project in Mansoura records full electrical works, with the Egyptian Ministry of Health as owner and an August 2024 start.
Project Information
The Plasma Bank project in Mansoura records full electrical works, with the Egyptian Ministry of Health as owner and an August 2024 start.
- Location
- Mansoura
- Owner
- Egyptian Ministry of Health
- Main Contractor
- Protection
- Scope
- Full electrical scope
- Duration
- Aug 2024 - status requires update
Delivery Approach
Coordinating the Scope and Tracking Critical Details
The project approach begins with document and responsibility review, followed by route and interface coordination, delivery monitoring and inspection. Unverified challenges or results are not added to the case study.
- Scope and drawing review
- Discipline and interface coordination
- Execution and quality follow-up
- Inspection and handover support